Appeal Allowed | PA15/01953 | Construction of a pair of semi-detached dwellings - 12 Back Lane | Decision APP/D0840/W/15/3121461

Extract of permission - via http://docs.planning.cornwall.gov.uk/rpp/showimage.asp?j=PA15/01953&inde...

ANNEX TO APPEAL DECISION APP/D0840/W/15/3121461

Conditions:

1) The development hereby permitted shall begin not later than three years
from the date of this decision.

2) The development hereby permitted shall be carried out in accordance
with the following approved plans: Proposed Floor Plans 386/2; and
Mixed – site location and elevations 386/3.

3) Before any of the development hereby permitted is brought into use,
parking and turning areas shall be provided in accordance with a detailed
scheme which shall have been submitted to and approved in writing by
the local planning authority. The parking and turning areas shall not
thereafter be obstructed or used for any other purpose.

4) No development shall take place until there has been submitted to and
approved in writing by the local planning authority a plan indicating the
topography and landscaping of the plot. No land below 16.3m AOD to
the south-west of the proposed dwellings shall be raised. Development
shall be carried out in accordance with the approved details and shall not
thereafter be altered or removed, other than by necessary maintenance.

5) No development shall take place until there has been submitted to and
approved in writing by the local planning authority a plan indicating the
positions, design, materials, height and type of boundary treatment to
be erected. Boundary features in the rear garden within 10m of the
south west boundary of the plot shall be of open design to allow free
passage of flood waters. The boundary treatment shall be completed
before the buildings are occupied. Development shall be carried out in
accordance with the approved details and shall not thereafter be altered
or removed, other than by necessary replacement.

6) Before the development hereby approved is commenced, details of a
scheme for the management of the site's surface water shall be
submitted to an approved in writing by the local planning authority. The
details shall include as a minimum:
(i) Details of the final drainage scheme, including pathways and flow
routes for excess surface water during extreme weather;
(ii) A construction quality control procedure;
(iii)A plan for the future maintenance of the system and of any overland
flow routes.
The scheme shall be completed in accordance with the agreed details
prior to first occupation. The scheme shall thereafter be maintained in
accordance with the approved details.

7) No development shall commence, including any works of demolition, until
a Construction Method Statement has been submitted to, and approved
in writing by, the local planning authority. The approved statement shall
be adhered to throughout the construction period. The Statement shall
provide for:
(i) the parking of vehicles of site operatives and visitors;
(ii) loading and unloading of plant and materials;
(iii) storage of plant and materials used in constructing the
development;
(iv) the erection and maintenance of security hoarding including
decorative displays and facilities for public viewing, where
appropriate;
(v) wheel washing facilities;
(vi) measures to control the emission of dust and dirt during
construction;
(vii) a scheme for recycling/disposing of waste resulting from demolition
and construction works;
(viii) hours of working.

Book page

TitleCreated
240325 | Open letter to all party candidates | sign to help Cornwall Wildlife Trust make difference for Nature at election 1 day 4 hours agoBook page
240310 | Detailed plans for affordable-led housing in Connor Downs 10th March 2 weeks 3 days agoBook page
240310 | Waste collections changes Helston, Penzance, Hayle | second phase:food waste, recycling, rubbish - commences July 2 weeks 3 days agoBook page
240218 | Collapsed North Quay development in Hayle described as a 'sea of despair' 5 weeks 22 hours agoBook page
240214 | Hayle North Quay development collapse sees eight companies go bust Work has ground to a halt on the blocks of flats 5 weeks 3 days agoBook page
240220 | Poling works | Grist Lane and Marsh Lane, Angarrack | expected 20 Feb 2024 0830-1630, for one day 7 weeks 2 days agoBook page
231130 | Are you ready for weekly food waste recycling? | Food Waste, Recycling and Rubbish Collection Changes 16 weeks 9 hours agoBook page
230821 | People of Cornwall town 'thrown under bus' over housing plan | direct result of councillors handled Hayle masterplan 31 weeks 1 day agoBook page
230817 | When will new rubbish collection changes start, Cornwall 31 weeks 6 days agoBook page
230809 | Holiday park in Cornwall for emergency housing still empty | Sandbank site purchased Cornwall Council in Jan 2022 32 weeks 5 days agoBook page
230811 | Decision on huge solar farm at Carnhell Green: refused 32 weeks 5 days agoBook page
230809 | Nearest NHS dental practice to Cornwall taking new patients 32 weeks 5 days agoBook page