Village News

Christmas Lights

North Quay Hayle | Work | View | FCBStudios

North Quay, Hayle
Gallery
In Brief

Client:
Sennybridge (Hayle) Ltd

Location:
Hayle, Cornwall

Cost:
Not disclosed

Completion:
Construction to begin in 2019

FCBStudios' third and largest phase of work for Hayle embraces the industrial heritage of the Cornish town by creating a lively and coherent vision that is sensitive to its UNESCO World Heritage Site location.

The scheme proposes around 300 homes with waterside commercial spaces and a generous new public square to the north of the historic dockyards, inspired by the coal wharf heritage of the site. The continued operation of the harbour and the use of the fishermen's quay have shaped the masterplan designs and the structure of the coal wharf has informed the use of space.

Adjacent to the quayside, a mix of wharf houses and apartment buildings with active commercial ground floors occupy a prominent position and benefit from expansive views across the estuarine setting.

Narrow wharf lanes evoke the historic railway routes that once weaved their way through the structures and buildings, to create spaces sheltered from the prevailing south westerly wind. These routes connect the main route through the site with key points within the wharf area, the harbourside and North Quay Square.

Narrow wharf lanes evoke the historic railway routes that once weaved their way through the structures and buildings, to create spaces sheltered from the prevailing south westerly wind. These routes connect the main route through the site with key points within the wharf area, the harbourside and North Quay Square.

Above North Quay, an area of larger detached and semi-detached homes are embedded in the dune landscape with light and airy living spaces and dramatic views over the estuary. A former industrial yard is reimagined to create a sheltered subtropical garden and the soft vegetation of the hilltop will flow down over the south facing escarpment to form a lush and sheltered environment.

Read Matt Williams' Explore article 'Onwards' about his work to create a contemporary harbourside town within the World Heritage Site.

More information can be found here about South Quay Hayle Phases One and Two.

Drawings

via https://fcbstudios.com/work/view/north-quay-hayle

Book page

TitleCreated
2026-April-POSTPONED-planned improvements i.e. install footpath, paint double yellow lines junction Grist Lane Hatchs Hill 3 days 5 hours agoBook page
2026 - Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 2 weeks 1 day agoBook page
250330; Closure order:30 Mar-17 Apr 2026; 07:30-17:00; Clearway Parking Zone; Hatchs Hill, Steamers Hill and Angarrack Lane 3 weeks 2 days agoBook page
Traffic/Roads - Marsh/Grist Lane - Traffic counts 2019 onwards 14 weeks 6 days agoBook page
Approved with conditions | PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom... 19 weeks 2 days agoBook page
PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom, covered parking area below | As 20 weeks 1 day agoBook page
251027 | 20mph Monitoring—Hayle & St Ives Speed Data; Phase 3a-May-Jun 24 v Sep-Oct 24; Steamers Hill; Gwinear;Carbis;Nancledra 24 weeks 1 day agoBook page
PA25/07184 | Retention of 4no. existing holiday pods, swimming pool, incidental building, extended driveway and annexe converted 24 weeks 5 days agoBook page
251009 | Stark reality of life in Cornwall revealed through 2025 Vital Signs Report 26 weeks 5 days agoBook page
251010 | Cornwall backs 20mph rollout; St Austell's the only town to reject the plans 26 weeks 6 days agoBook page
250930 | Cornwall’s 20 mph speed limits have made the roads much safer 28 weeks 2 days agoBook page
250905 - POSTPONED: Proposed resurfacing of Steamers Hill/Hatch's Hill that was due to happen end of July beginning of August 31 weeks 11 hours agoBook page